Phase 1

Specifications

STRUCTURE

  • Reinforced concrete / Steel frame / Steel trusses

walls

  • Brick wall / Cladding wall

roof

  • Mainly metal deck roofing with suitable sisalation

ceiling

  • Class 'O' ceiling for office, where indicated

windows

  • Mainly aluminium framed openable and fixed windows

doors

  • Metal roller shutter for service entrance.
  • Aluminium framed glass door, plywood flush door, fire-rated door and PVC door with quality locks .

floor finishes

  • Tile finish for toilet.
  • Cement rendering for others

wall finishes & Painting

  • Weather resistant paint or approved equivalent externally.
  • Elmusion paint internally.
  • Gloss paint to wood and metal surfaces.
  • Tile finish for toilet.

sanitary installation

  • Quality sanitary ware with fittings

ELECTRICAL INSTALLATION

  • Cluster Factory - Three phase (setting at 150 Amp) 415 Volts electricity supply terminating at the main switchboard
  • Semi-Detached Factory - Three phase (setting at 200 Amp) 415 Volts electricity supply terminating at the main switchboard

gate & fencing

  • Sliding mild steel gate, brick wall, bin centre, and BSP fencing
  • Reinforced concrete / Steel frame / Steel trusses
  • Brick wall / Cladding wall
  • Mainly metal deck roofing with suitable sisalation
  • Class 'O' ceiling for office, where indicated
  • Mainly aluminium framed openable and fixed windows
  • Metal roller shutter for service entrance.
  • Aluminium framed glass door, plywood flush door, fire-rated door and PVC door with quality locks .
  • Tile finish for toilet.
  • Cement rendering for others
  • Weather resistant paint or approved equivalent externally.
  • Elmusion paint internally.
  • Gloss paint to wood and metal surfaces.
  • Tile finish for toilet.
  • Quality sanitary ware with fittings
  • Cluster Factory - Three phase (setting at 150 Amp) 415 Volts electricity supply terminating at the main switchboard
  • Semi-Detached Factory - Three phase (setting at 200 Amp) 415 Volts electricity supply terminating at the main switchboard
  • Sliding mild steel gate, brick wall, bin centre, and BSP fencing