ENG
ENG
BM
中文
Register
(current)
ENG
ENG
BM
中文
All Products
Register
(current)
ENG
ENG
BM
中文
Register
(current)
Home
Location
Master Plan
Features
Products
Phase I
Cluster Factory
70’ x 120’
Cluster Factory
70’ x 150’
Semi-Detached Factory 80’ x 180’
Phase II Eco Hub
Cluster Retail Warehouse 60' X 120'
Cluster Retail Warehouse 60' X 150’
Eco Curve
2 Storeys Shop Offices 22’X70’
NEW
Phase III
Cluster Factory 60'x120'
Cluster Factory 60'x150'
EcoWorld Business Community
Contact
Newsletter
Home
Location
Master Plan
Features
Products
Phase I
Cluster Factory 70’ x 120’
Cluster Factory 70’ x 150’
Semi-Detached Factory 80’ x 180’
Phase II Eco Hub
Cluster Retail Warehouse 60' X 120'
Cluster Retail Warehouse 60' X 150’
Eco Curve
2 Storeys Shop Offices 22’X70’
NEW
Phase III
Cluster Factory 60'x120'’
Cluster Factory 60'x150'’
EcoWorld Business Community
Contact
Newsletter
PHASE 1
CLUSTER factory 70’ x 120’
CLUSTER factory 70’ x 150’
semi-detached factory 80’ x 180’
eco hub
CLUSTER RETAIL WAREHOUSE 60' X 120'
CLUSTER RETAIL WAREHOUSE 60' X 150'
eco curve
2 storeys shop offices 22’x 70’
eco curve
PHASE 1
eco hub
2 storeys shop offices 22’x 70’
CLUSTER factory 70’ x 120’
CLUSTER factory 70’ x 150’
semi-detached factory 80’ x 180’
CLUSTER RETAIL WAREHOUSE 60' X 120'
CLUSTER RETAIL WAREHOUSE 60' X 150'
Phase 1
Semi Detached Factory 80’ x 180’
Cluster Factory 70′ x 150′
Cluster Factory 70′ x 120′
Semi Detached Factory 80’ x 180’
Cluster Factory 70′ x 150′
Cluster Factory 70′ x 120′
Download brochure
Download brochure
Floor Plans
70’ x 120’
70’ x 150’
80’ x 180’
Cluster Factory
Specifications
STRUCTURE
Reinforced concrete / Steel frame / Steel trusses
walls
Brick wall / Cladding wall
roof
Mainly metal deck roofing with suitable sisalation
ceiling
Class 'O' ceiling for office, where indicated
windows
Mainly aluminium framed openable and fixed windows
doors
Metal roller shutter for service entrance.
Aluminium framed glass door, plywood flush door, fire-rated door and PVC door with quality locks .
floor finishes
Tile finish for toilet.
Cement rendering for others
wall finishes & Painting
Weather resistant paint or approved equivalent externally.
Elmusion paint internally.
Gloss paint to wood and metal surfaces.
Tile finish for toilet.
sanitary installation
Quality sanitary ware with fittings
ELECTRICAL INSTALLATION
Cluster Factory - Three phase (setting at 150 Amp) 415 Volts electricity supply terminating at the main switchboard
Semi-Detached Factory - Three phase (setting at 200 Amp) 415 Volts electricity supply terminating at the main switchboard
gate & fencing
Sliding mild steel gate, brick wall, bin centre, and BSP fencing
STRUCTURE
Reinforced concrete / Steel frame / Steel trusses
walls
Brick wall / Cladding wall
roof
Mainly metal deck roofing with suitable sisalation
ceiling
Class 'O' ceiling for office, where indicated
windows
Mainly aluminium framed openable and fixed windows
doors
Metal roller shutter for service entrance.
Aluminium framed glass door, plywood flush door, fire-rated door and PVC door with quality locks .
floor finishes
Tile finish for toilet.
Cement rendering for others
wall finishes & Painting
Weather resistant paint or approved equivalent externally.
Elmusion paint internally.
Gloss paint to wood and metal surfaces.
Tile finish for toilet.
sanitary installation
Quality sanitary ware with fittings
ELECTRICAL INSTALLATION
Cluster Factory - Three phase (setting at 150 Amp) 415 Volts electricity supply terminating at the main switchboard
Semi-Detached Factory - Three phase (setting at 200 Amp) 415 Volts electricity supply terminating at the main switchboard
gate & fencing
Sliding mild steel gate, brick wall, bin centre, and BSP fencing